back to projects
We
helped Communityworks Non-Profit Housing Corporation to
develop, as a pilot project, the first multi-storey multi-unit
apartment building in Ontario to be manufactured inside
a factory. Paterson Walk, in Ottawa's Parkdale Market
district, was manufactured during the winter of 1990 by
Morewood Industries (now Guildcrest Homes) inside their
factory at Morewood, Ontario. The 37 modules were then
transported to a prepared site at the corner of Pinehurst
and Bullman streets where they were craned into place
over a 3 day period. The interior was finished and exterior
siding was applied.
The
$1.8 million 22 unit project boasted a standard of construction
unusual in wood-frame buildings. Because the components
were manufactured in ideal interior conditions, using
kiln-dried lumber, the quality of the structure was superior
to most site-built wood-frame buildings. Also, because
each module had to be built to a standard capable of being
transported by road, the overall building was structurally
superior to conventional building and exhibited superior
sound resistance qualities.
click
the images to enlarge